The accompanying table records the 10 largest construction project starts in Canada in September 2022. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
REGION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s |
Dollars
000,000s |
Quebec | ||||
Terrebonne | Institutional | Hôpital Pierre-Le Gardeur Addition and Renovation | 426 | $150 |
(4 structures; 11 storeys; 246 units) 911 Montée des Pionniers | ||||
Société Québeçoise des Infrastructures | ||||
Vaudreuil-Dorion | Commercial | Pôle Municipal Construction in Vaudreuil-Dorion | 200 | $85 |
(4 structures; 3 storeys) rue Émile-Bouchard | ||||
Ville de Vaudreuil-Dorion | ||||
Ontario | ||||
Chalk River | Industrial | Advanced Nuclear Material Research Centre (ANMRC) / Chalk River | 109 | $500 |
(2 structures; 2 storeys) Plant Rd | ||||
Canadian Nuclear Laboratories | ||||
Cambridge | Industrial | Blair Industrial Business Park Warehouse – Amazon Fulfillment Centre | 1,080 | $150 |
(1 structure; 1 storey) 140 Old Mill Rd | ||||
Boccolini Construction Inc (Owner’s Rep) | ||||
London | Commercial | The Gateway Shopping Centre | 829 | $110 |
(2 structures; 2 storeys) 3130 Dingman Dr | ||||
PenEquity Realty Corporation | ||||
Mississauga | Residential | Edge Towers – Tower 3 (Oro) | 460 | $88 |
(4 structures; 62 storeys; 614 units) 16 Elm Dr | ||||
Solmar Development Corp | ||||
Queensville | Institutional | Construction of the Health and Active Living Plaza (HALP) | 86 | $86 |
(3 structures; 2 storeys) 48 Jim Mortson Dr | ||||
Town of East Gwillimbury | ||||
Alberta | ||||
Redcliff | Civil/Engineering | Wild Rose 2 – Wind Power Project | * | $360 |
(1 structure) | ||||
Capstone Infrasture Corp | ||||
Edmonton | Institutional | Covenant Wellness Community Health Centre | 200 | $95 |
(2 structures; 3 storeys) 7319 29 Ave NW | ||||
Covenant Health Corporate Office | ||||
Jenner | Civil/Engineering | Buffalo Atlee Wind Farm | * | $105 |
(1 structure) | ||||
Capstone Infrasture Corp | ||||
TOTALS: | 3,390 | $1,709 |
Moving totals of the latest 12 months*
(ConstructConnect Insight Forecast Figures)
Interactive Visual
View this video to see how to use the filters in the Interactive Visual.
Please click on the following links to download the PDF versions of this month’s Top 10 and Trend Lines:
Top 10 largest construction project starts in Canada – September 2022 – PDF
Construction Project Starts Trend Graph – Canada – September 2022 – PDF
Recent Comments
comments for this post are closed