The accompanying table records the 10 largest construction project starts in Canada in April 2017. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
REGION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s |
Dollars
000,000s |
Quebec | ||||
Gatineau | Engineering | Secteur de Hull – Wastewater Treatment Plant | * | $58 |
Ville de Gatineau | ||||
Ontario | ||||
Hamilton | Engineering | Woodward Ave Water Treatment Plant Upgrades | * | $88 |
(1 structure) 700 Woodward Ave | ||||
City of Hamilton | ||||
Oakville | Residential | Marlborough Court Apartment Building / Oakville | 405 | $68 |
(2 structures; 544 units; 14 storeys) 1229 Marlborough Crt | ||||
Minto Group Inc | ||||
Toronto | Engineering | Reconfiguration of Six Points Interchange – Phase II (Master Contract) | * | $58 |
Dundas St W, Bloor St W, Kipling Ave intersections | ||||
City of Toronto | ||||
Oshawa | Residential | University Studios Condominium | 300 | $40 |
(2 structures; 8 storeys) 1900 Simcoe St N | ||||
Podium Development Corp | ||||
Burlington | Institutional | Schlegel Villages, Village of Tansley Woods Expansion on Upper Middle Road, Phase Three | 208 | $35 |
(1 structure; 208 units; 10 storeys) 4100 Upper Middle Rd, Itabashi Way | ||||
RBJ Schlegel Holdings Inc | ||||
Alberta | ||||
Vulcan | Engineering | Vulcan Solar Project – Phase One and Two | * | $155 |
Blackspring Ridge Wind Farm, Vulcan County | ||||
EDF EN Canada | ||||
Edmonton | Residential | West Block Mixed-Use Development – Phase One (100 & 300 West Block) | 210 | $60 |
(3 structures; 60 units; 22 storeys) 142 St and Stony Plain Rd | ||||
Beaverbrook Developments Inc | ||||
British Columbia | ||||
Surrey | Residential | Panorama West Coast Living Townhome Development | 329 | $51 |
(3 structures; 644 units; 5 storeys) 13812, 13856, 13890 13928 and 13906 64 Ave, 6378 138 St | ||||
0801212 BC Ltd | ||||
North Vancouver | Engineering | Highway 1 at Mountain Highway Interchange | * | $37 |
BC Ministry of Transportation & Infrastructure | ||||
TOTALS: | 1,452 | $650 |
Recent Comments
comments for this post are closed