DEMOLITION BID NOTICE

Arthur Meighen Building Renovations (AMBR)
25/55 St. Clair East
Toronto, Ontario

Tender Start Date:       June 15, 2018
Tender Closing Date:  July 17, 2018

Urbacon Buildings Group Inc., as Construction Manager and in support  of  BGIS  (Owner),  invites interested Demolition and Abatement contractors to confirm Security Clearance and bonding requirements below to subsequently be added to the Bid Invite List.

Project: $100 million extensive base building upgrades/ installations including demolition, abatement, mechanical, electrical, life safety systems, seismic, roof, building envelope and architectural finishes to a 10-storey building with 2.5 floors of underground parking and approx. 46,000 sq m gross floor area.

Clearance Required: ALL subcontractors must hold a valid DESIGNATED ORGANIZATION SCREENING (DOS) certification number issued/approved by the Canadian Industrial Security Directorate (CISD), Public Works and Government Services Canada (PWGSC). ALL onsite staff must hold a valid Reliability Clearance Certificate.

Prior to receiving the bid package:

  • All proponents must email a copy of their DOS Certification to  AMBR@URBACON.NET. Confirmation of Reliability Clearance for (20) twenty staff members will be required at time of bid closing.
  • All proponents must confirm acceptance of a mandatory bid bond of 10% of the overall base bid.
  • All proponents must confirm acceptance to provide a performance bond  and  a  labour  and  materials  payment bond, each in the amount of 50% of the base bid inclusive of Harmonized Sales Tax. All costs for all bonds will be included in the Subcontract price.
  • All proponents must provide a CCDC11 showing a minimum of (3) three projects complete within the last (3) three years with a contract value in excess of $7,000,000.

Neither BGIS nor Urbacon will be liable for ANY costs incurred in preparing a Proposal nor arising from obtaining the specified clearance(s).

SUBCONTRACT  AWARDS  WILL  NOT  BE  DELAYED TO ALLOW TIME TO OBTAIN THE REQUIRED SECURITY  CLEARANCE.  SECURITY  CLEARANCE  IS A PASS OR FAIL. ALL BONDING REQUIREMENTS LISTED ABOVE ARE MANDATORY; BID PACKAGES WILL NOT BE DISTRIBUTED WITHOUT ACCEPTANCE OF BID BOND AND PERFORMANCE BOND REQUIREMENTS STATED ABOVE.