Skip to Content
View site list

Profile

Pre-Bid Projects

Pre-Bid Projects

Click here to see Canada’s most comprehensive listing of projects in conceptual and planning stages

Economic

Top 10 largest construction project starts in Canada and Trend Graph - October 2018

Top 10 largest construction project starts in Canada and Trend Graph - October 2018

The accompanying table records the 10 largest construction project starts in Canada in October 2018. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.

Top 10 largest construction project starts in Canada and Trend Graph - October 2018

There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.

Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.

Top 10 construction projects of the month – October 2018
REGION
(East to

West)
TYPE OF
CONSTRUCTION
DESCRIPTION
Sq. Ft.
000s
Dollars
000,000s
Quebec
Longueuil Industrial Design Build Molson Coors Brewery / Longueuil 750 $138
(3 structures; 2 storeys) rue Roméo Vachon
La Compagnie Moslon Canada
 
Mascouche Industrial CentrOparc Industrial and Office Complex 1,600 $50
(4 structures; 6 storeys) Junction of Highway 25 and 640
Le Groupe Montoni
 
Granby Commercial Centre Aquatique Granby 44 $33
(1 structure; 2 storeys) 555 rue Léon-Harmel
Ville de Granby
         
Ontario
Windsor Engineering/Civil Design Build Gordie Howe International Bridge * $4,000
(2 structures) end of Hwy 401, Windsor Ontario
Windsor-Detroit Bridge Authority
 
Toronto Residential 390 Dufferin Rental Residences 400 $80
(4 structures; 12 storeys; 421 units) 390-444 Dufferin St
Fitzrovia Real Estate Inc
 
Toronto Residential Bianca Boutique Condominium 275 $48
(3 structures; 9 storeys; 502 units) 420 Dupont St
Tridel
 
Hamilton Residential Platinum Condominium, Retail, Church 197 $34
(4 structures; 27 storeys; 294 units) 15 Queen St S
Rise Real Estate Inc
 
Bradford Industrial MiTek Canada Industrial Building (Shell and Interior) 250 $34
(2 structures; 1 storey) Side Rd 5 and Hwy 88
MiTek Canada
         
Alberta
Edmonton Institutional Pilot Sound and Larkspur/ Soraya Hafez K-6 School & Thelma Chalifoux 7-9 School 130 $42
(2 structures; 4 storeys; 1500 units) 980 McConachie Blvd NW and 2845 43a Ave NW
Edmonton Public Schools
         
British Columbia
Burnaby Residential Etoile Residences Condominium Towers 350 $62
(3 structures; 32 storeys; 857 units) 2360 and 2390 Douglas Rd, 5343 Goring St
Millennium Developments
 
TOTALS:     3,996 $4,521
 
*A square footage measure does not apply for alteration and engineering work.
Data source and table: ConstructConnect – CanaData.
Trend lines of construction starts in Canada – October 2018
Moving totals of the latest 12 months*
(ConstructConnect Insight Forecast Figures)
Trend lines of construction starts in Canada – October 2018
*For example, the October 2018 figure is the sum of the monthly numbers for November 2017 through October 2018.
Data source and chart: ConstructConnect Insight – CanaData.

Recent Comments

comments for this post are closed

You might also like