The accompanying table records the 10 largest construction project starts in Canada in July 2019. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
REGION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s |
Dollars
000,000s |
Quebec | ||||
Montréal | Commercial | Design/Build Three Transportation Centres Addition and Alterations | * | $177 |
(3 structures; 2 storeys) Multiple Locations | ||||
Société de Transport Montréal | ||||
Québec | Engineering/Civil | Centre de biométhanisation de la matière organique (CBMO) – Lot SP-009 | * | $85 |
(1 structure) Boulevard Henri-Bourassa | ||||
Ville de Québec | ||||
Ontario | ||||
Kingston | Engineering/Civil | Design / Build Bridge – Third Crossing of the Cataraqui River / Kingston | * | $180 |
(2 structures) east side of Gore Rd and John Counter Blvd | ||||
City of Kingston | ||||
Scarborough | Engineering/Civil | Highway 401 – Grading, Drainage, Granular Base, Hot Mix Paving, Noise Barrier, Electrical, ATMS and Structures | * | $178 |
(2 structures) Multiple Locations | ||||
Ministry of Transportation of Ontario | ||||
Toronto | Commercial | St Lawrence Market – North Building | 117 | $92 |
(2 structure; 5 storeys) 92 Front St E | ||||
City of Toronto | ||||
Markham | Engineering/Civil | Highway 404 – Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, ATMS and Structural | * | $90 |
(4 structures) ON-404 | ||||
Ministry of Transportation of Ontario | ||||
Toronto | Residential | Canary Commons Condos: Block 12 Mixed-Use Revelopment | 347 | $70 |
(3 structures; 12 storeys; 400 units) 475 Front St E | ||||
DREAM Realty Management Corp/LDL | ||||
Alberta | ||||
Edmonton | Institutional | University of Alberta-Dentistry Pharmacy Building Core and Shell Development | * | $100 |
(3 structures) 11410 87 Ave NW | ||||
University of Alberta | ||||
British Columbia | ||||
Richmond | Engineering/Civil | YVR – Vancouver International Airport Central Utilities Building | 64 | $170 |
(2 structure; 3 storeys) Grant McConachie Way | ||||
Vancouver International Airport Authority | ||||
Port Moody | Residential | The Grande – Suter Brook Village Multi-Residential Development, Final Phase | 430 | $74 |
(2 structures; 26 storeys; 290 units) Capilano Rd | ||||
Onni Group of Companies | ||||
TOTALS: | 958 | $1,216 |
Moving totals of the latest 12 months*
(ConstructConnect Insight Forecast Figures)
CanaData 2019 Conference – Canada’s construction forecasts conference –
October 18, 2019, Globe & Mail Centre, Toronto – Learn more below.
Recent Comments
comments for this post are closed