The accompanying tables show the top 10 major upcoming Water Treatment Plant and Manufacturing & Warehousing construction projects in the U.S. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, libraries and museums, sports and entertainment complexes, industrial projects and government buildings will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer | Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
HUNTINGTON BEACH WATER DESALINATION FACILITY | |||
Poseidon Water – Carlsbad | Huntington Beach CA | Pre-Design | $1,400 |
EAGLE MOUNTAIN PUMPED STORAGE | |||
NextEra Energy Resources LLC / NextEra Energy Inc. | Twentynine Palms CA | Pre-Design | $1,400 |
EVERGLADES AGRICULTURAL AREA (EAA) RESERVOIR DESIGN PROJECT | |||
US Army Corps of Engineers | West Palm Beach FL | Pre-Design | $900 |
RFP CONSTRUCTION MANAGER – BULL RUN FILTRATION FACILITY | |||
City of Portland – Bureau of Purchases | Portland OR | Construction Documents | $650 |
WICHITA WATER TREATMENT PLANT | |||
City of Wichita Falls | Wichita KS | Pre-Design | $553 |
STRAITS OF MACKINAC TUNNEL CONSTRUCTION – GREAT LAKES 5 PIPELINE REPLACEMENT | |||
Enbridge Energy LP – Superior | Mackinaw City MI | Pre-Design | $500 |
MI CLEAN WATER – STATE OF MICHIGAN | |||
Michigan Department of Environment, Great Lakes, and Energy (EGLE) | Traverse City MI | Pre-Design | $500 |
MID-BRETON SEDIMENT DIVERSION – CITY OF PLAQUEMINE | |||
Coastal Protection and Restoration Authority (CPRA) | Plaquemine LA | Pre-Design | $488 |
WEST BASIN MWD- OCEANWATER DESALINATION FULL SCALE | |||
West Basin Municipal Water District | Redondo Beach CA | Pre-Design | $400 |
SOUTHERLY TUNNEL AND CONSOLIDATION – NORTHEAST OHIO REGIONAL SEWER DISTRICT (NEORSD) | |||
Northeast Ohio Regional Sewer District (NEORSD) | Cleaveland OH | Pre-Design | $326 |
Project Title and Owner/Developer | Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
TAIWAN SEMICONDUCTOR MANUFACTURING DEVELOPMENT / PHOENIX | |||
TSMC North America | Phoenix AZ | Pre-Design | $12,000 |
JORDAN COVE LNG FACILITY AND THE PACIFIC CONNECTOR GAS PIPELINE | |||
Pembina Pipeline Corporation | North Bend OR | Design Development | $10,000 |
FORMOSA PLASTICS SUNSHINE PROJECT | |||
Formosa Plastics Corporation, Texas | Saint James LA | Pre-Design | $9,400 |
SEMPRA ENERGY – LIQUEFIED NATURAL GAS EXPORT TERMINAL – PHASE 1 TRAINS 1 & 2 / PORT ARTHUR | |||
Sempra Energy | Port Arthur TX | Construction Documents | $9,000 |
RIO GRANDE LNG | |||
NextDecade | Port Isabel TX | Construction Documents | $9,000 |
PLAQUEMINES PROJECT | |||
Venture Global LNG Inc. | Belle Chasse LA | Pre-Design | $8,500 |
LNG EXPORT FACILITY | |||
Kinder Morgan Energy Partners | Pascagoula MS | Design Development | $8,000 |
CHEVRON PHILLIPS AND QATAR PETROLEUM – US GULF COAST II PETROCHEMICAL PROJECT | |||
Chevron Phillips Chemical Co. | Orange TX | Pre-Design | $8,000 |
PTTGC AMERICA ETHANE CRACKER PLANT | |||
PTTGC America | Shadyside OH | Construction Documents | $7,500 |
PROJECT TIM MANUFACTURING PLANT / DURAND | |||
New Steel International Inc | Vernon City MI | Pre-Design | $7,000 |
While every effort is made to ensure the correctness of ConstructConnect’s information, we have hundreds of thousands of projects in our database and some errors will occur. We greatly appreciate hearing from readers concerning updates and will make proper revisions promptly.
Recent Comments
comments for this post are closed