BC Hydro proposes leaving Site C structures at the bottom of the Peace River

BC Hydro is asking for permission to leave 45 structures at the bottom of the Peace River once the multibillion-dollar Site C reservoir begins filling. In a request to the B.C. Environmental Assessment Office, BC Hydro claims the structures would be more detrimental to the local fish species and habitat if removed than if allowed … Continue reading BC Hydro proposes leaving Site C structures at the bottom of the Peace River