Bridge River BR2 INOG Slope Stability Improvement Project
- Tender # 10380
- Publication Date:
- Category:
- Civil
- Subcategory:
- Bridges/Tunnels
- Type:
- Tender
- Location:
- Seton Portage, British Columbia
- Bid Date:
Tender Description
Site work for a bridge / tunnel in Seton Portage, British Columbia. Completed plans call for site work for a bridge / tunnel.
These Instructions are for a contract that generally includes excavation, concrete lock block installation, danger tree removal, drain pipe installation, and geo-mesh installation on the slope above the Bridge River 2 intake tower on Carpenter Lake, near Terzaghi Dam.
Name | Company | Role | Phone |
---|---|---|---|
I.S. Hundal | BC Hydro and Power Authority | Civil Engineer | (604) 623-4346 |
Lisa Gahir | BC Hydro and Power Authority | Contracts Administrator | (604) 623-4346 |
Construction Manager | BC Hydro and Power Authority | Owner | (604) 623-4346 |