RFP – Powerhouse Cranes for Wahleach and Lake Buntzen
- Tender # 9756
- Publication Date:
- Category:
- Industrial
- Subcategory:
- Power Plant
- Type:
- Request for proposal
- Location:
- Chilliwack, British Columbia
- Bid Date:
Tender Description
Renovation of a power facility in Chilliwack, British Columbia. Completed plans call for the renovation of a power facility.
The scope of work includes the design, supply, delivery, installation, testing and commissioning of powerhouse bridge cranes for the Generating Stations at Wahleach (located approximately 25 km east of Chilliwack, B.C.) and the Lake Buntzen station (approximately 10km north of Coquitlam, B.C.) The Scope of Services also includes the removal and disposal of the existing powerhouse cranes.
Name | Company | Role | Phone |
---|---|---|---|
Construction Manager | BC Hydro and Power Authority | Owner | (604) 623-4346 |