Sentinel Day Use Area – Riverbank Reconstruction

Tender # 18TDRPKC814,161 -16447-00,216-026
Publication Date:
Category:
Civil
Subcategory:
Roads/Highways
Type:
Tender
Location:
Cochrane, Alberta
Bid Date:
Tender Description

Site work and paving for a civil project in Cochrane, Alberta. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Sentinel Day Use Area Riverbank Reconstruction project involves the supply and installation vegetative rip rap armouring (approximately 7,300 m3 of Class 3 rip rap, riverbed cobble capping and approximately 1,500 live willow bundles); site isolation, fish capture and release, and turbidity monitoring; removal and disposal of debris, asphalt, existing washroom structure and garbage bin; earthworks (approximately 24,000 m3 of borrow and 12,000 m3 of common excavation); supply and installation of open cut and bored culverts; intersection improvements and access road construction (approximately 7,000 t of GBC and 3,800 t of ACP); construction of a concrete 4-drop double vault washroom structure, line painting and landscape rehabilitation.

Bid Documents are available in electronic form, from COOLNet Alberta at www.coolnetalberta.com.

 

Name Company Role Phone
Project Architect BRZ Partnership Architecture Inc. Architect (403) 532-5980
Gordon Boenig WSP Canada Inc Civil Engineer (780) 466-6555
Ming Jiao WSP Canada Inc Civil Engineer (780) 466-6555
Mark Visser WSP Canada Inc Consultant (780) 466-6555
Wayne Hallstrom WSP Canada Inc Consultant (780) 466-6555
Maxime Veilleux Alberta Environment and Parks (Kananaskis Region, Operations Support) Contracts Administrator (403) 932-0386
Shane Hemenway Alberta Environment and Parks (Kananaskis Region, Operations Support) Contracts Administrator (403) 878-4627
Construction Manager Alberta Environment and Parks (Kananaskis Region, Operations Support) Owner (403) 932-0386

 

Further project Details from ConstructConnect