The accompanying tables shows the top 10 major upcoming Alberta and British Columbia construction projects in Canada. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, government buildings, industrial projects, oil and gas projects, and electric power and telecommunications projects will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer | Location | Current Stage |
Project Value canadian $ |
---|---|---|---|
CALGARY TO EDMONTON TRANSPOD HYPERLOOP PROJECT | |||
TransPod Inc | Calgary AB | Schematic Design | $22,460,000,000 |
PRAIRIE LINK HIGH-SPEED RAIL | |||
EllisDon | Edmonton AB | Pre-Design | $9,000,000,000 |
SINOCAN GLOBAL – BITUMEN UPGRADING AND PETROCHEMICAL FACILITY | |||
Teedrum Inc. | St Michael AB | Pre-Design | $8,500,000,000 |
NORTH WEST UPGRADER – STURGEON REFINERY PHASE 2 & 3 | |||
Canadian Natural Resources Ltd. (CNRL) | Fort Saskatchewan AB | Pre-Design | $8,500,000,000 |
PIKE 1 IN-SITU PROJECT | |||
Canadian Natural Resources Ltd. (CNRL) | Chard AB | Construction Documents | $4,700,000,000 |
GREENVIEW PETROCHEMICAL PLANT | |||
Northern Petrochemical Corp. | Grovedale AB | Design Development | $2,500,000,000 |
NEW SOUTH EDMONTON HOSPITAL – P3 PROJECT | |||
Alberta Health Services | Edmonton AB | Pre-Design | $2,000,000,000 |
RED DEER REGIONAL HOSPITAL CENTRE REDEVELOPMENT | |||
Alberta Infrastructure | Red Deer AB | Schematic Design | $1,806,000,000 |
METRO LINE NW LRT EXPANSION – PHASE TWO (BLATCHFORD TO CASTLE DOWNS) | |||
City of Edmonton | Edmonton AB | Schematic Design | $1,800,000,000 |
TAIGA OIL SANDS PROJECT | |||
Strathcona Resources | La Corey AB | Construction Documents | $1,600,000,000 |
Project Title and Owner/Developer | Location | Current Stage |
Project Value CANADIAN $ |
---|---|---|---|
KITIMAT CLEAN REFINERY | |||
Kitimat Clean Ltd | Kitimat BC | Pre-Design | $22,000,000,000 |
PACIFIC FUTURE ENERGY REFINERY PROJECT | |||
Pacific Future Energy | Terrace BC | Pre-Design | $12,000,000,000 |
KSI LISIMS LNG PROJECT | |||
Nisga’a Lisims Government | Nisga’a BC | Pre-Design | $10,000,000,000 |
PRINCE RUPERT NATURAL GAS TRANSMISSION PIPELINE | |||
TC Energy | Hudson’s Hope BC | Design Development | $6,000,000,000 |
WOODFIBRE LNG PROJECT | |||
Enbridge Inc. | Squamish BC | Construction Documents | $5,100,000,000 |
KITSAULT ENERGY LNG PROJECT | |||
Kitsault Energy | Smithers BC | Pre-Design | $5,000,000,000 |
GARIBALDI AT SQUAMISH SKI RESORT | |||
Aquilini Development and Construction | Squamish BC | Pre-Design | $3,500,000,000 |
CEDAR LNG MARINE JETTY PROJECT | |||
Cedar LNG | Kitimat BC | Schematic Design | $3,000,000,000 |
ROBERTS BANK TERMINAL 2 PROJECT | |||
Vancouver Fraser Port Authority | Delta BC | Schematic Design | $2,500,000,000 |
SASQUATCH MOUNTAIN RESORT – MASTER PLAN | |||
Sts’ailes First Nation | Agassiz BC | Schematic Design | $2,500,000,000 |
While every effort is made to ensure the correctness of ConstructConnect’s information, we have hundreds of thousands of projects in our database and some errors will occur. We greatly appreciate hearing from readers concerning updates and will make proper revisions promptly.
Recent Comments
comments for this post are closed