The accompanying tables show the top 10 major upcoming Water Treatment Plant and Manufacturing & Warehousing construction projects in the U.S. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, libraries and museums, sports and entertainment complexes, industrial projects and government buildings will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer |
Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
SEPTIC TANK PHASEOUT – JACKSONVILLE ELECTRIC AUTHORITY | |||
JEA (Jacksonville Electric Authority) – Procurement | Jacksonville FL | Pre-Design | $2,000 |
HUNTINGTON BEACH WATER DESALINATION FACILITY | |||
Poseidon Water – Carlsbad | Huntington Beach CA | Pre-Design | $1,400 |
RFP CONSTRUCTION MANAGER – BULL RUN FILTRATION FACILITY | |||
City of Portland – Procurement | Portland OR | Construction Documents | $650 |
SMS: RFQ – PUBLIC-PRIVATE PARTNERSHIP (P3) PURIFIED WATER PROJECT | |||
Santa Clara Valley Water District (SCVWD) | San Jose, CA | Pre-Design | $600 |
STRAITS OF MACKINAC TUNNEL CONSTRUCTION – GREAT LAKES 5 PIPELINE REPLACEMENT | |||
Enbridge Energy LP – Superior | Mackinaw City MI | Construction Documents | $500 |
RFQ CONTRACTOR – YAZOO BACKWATER PUMPING PLANT | |||
US Army Corps of Engineers – Vicksburg District | Vicksburg MS | Pre-Design | $500 |
MID-BRETON SEDIMENT DIVERSION – CITY OF PLAQUEMINE | |||
Coastal Protection and Restoration Authority (CPRA) | Plaquemine LA | Pre-Design | $488 |
WATER AND SEWER – US ARMY CORPS OF ENGINEERS | |||
US Army Corps of Engineers – Vicksburg District | Lexington MA | Pre-Design | $400 |
GARDEN HILLS DETENTION BASIN PHASES 2, 3, 4, 5 – CITY OF CHAMPAIGN | |||
City of Champaign | Champaign IL | Pre-Design | $400 |
2020 BOND PACKAGE 1 – CITY OF TEMPE | |||
City of Tempe | Tempe AZ | Pre-Design | $350 |
Project Title and Owner/Developer |
Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
SAMSUNG AUSTIN SEMICONDUCTOR LLC CHIPMAKING PLANT | |||
Samsung Austin Semiconductor | Austin TX | Construction Documents | $17,000 |
FORMOSA PLASTICS SUNSHINE PROJECT | |||
Formosa Plastics LA | Saint James LA | Construction Documents | $9,400 |
GRON FUELS RENEWABLE DIESEL PLANT | |||
Fidelis Infrastructure | Baton Rough LA | Pre-Design | $9,200 |
SEMPRA ENERGY – LIQUEFIED NATURAL GAS EXPORT TERMINAL – PHASE 1 TRAINS 1 & 2 / PORT ARTHUR | |||
Sempra Energy | Port Authur TX | Construction Documents | $9,000 |
PLAQUEMINES PROJECT | |||
Venture Global LNG Inc. | Belle Chasse LA | Pre-Design | $8,500 |
PTTGC AMERICA ETHANE CRACKER PLANT | |||
PTTGC America | Shadyside OH | Construction Documents | $7,500 |
NACERO GASOLINE MANUFACTURING DEVELOPMENT / ODESSA | |||
Nacero Inc | Penwell TX | Pre-Design | $7,000 |
BLUE OVAL CITY MANUFACTURING FACILITY – FORD MOTOR COMPANY | |||
Ford Motor Land Development Corporation | Stanton TN | Pre-Design | $5,700 |
BLUEOVALSK BATTERY PARK – FORD MOTOR COMPANY | |||
Ford Motor Land Development Corporation | Glendale KY | Pre-Design | $5,700 |
SAMSUNG SEMICONDUCTOR MANUFACTURING FACILITY | |||
Samsung Semiconductor, Inc. | Phoenix AZ | Pre-Design | $5,600 |
While every effort is made to ensure the correctness of ConstructConnect’s information, we have hundreds of thousands of projects in our database and some errors will occur. We greatly appreciate hearing from readers concerning updates and will make proper revisions promptly.
Q. If Enbridge is serious about building a tunnel through the❤️of the Great Lakes, why is there no plan or $ allocated for it in their 2020 SEC 10k filing? A. The real purpose of the tunnel is to keep old line 5 operating 20+yrs. beyond its 50-year lifetime to earn $1-2million/day despite its shutdown order.