The Guildford Aquatic Centre is taking shape in Surrey, B.C. Crews lowered a 95 foot long truss into place recently.
Crews lowered a 95 foot long truss into place recently.
The truss included mechanical ducts, sprinklers, acoustical insulation and uplighting.
StructureCraft fabricated the trusses and was in charge of the lifts. Gwil was the crane company.
Heatherbrae is the general contractor for the Bing Thom designed addition to the Guildford Recreation Centre.
Recent Comments
comments for this post are closed