A crew with Prism Construction Ltd. braves the rain to erect tilt up concrete panels for a new structure for Bridge Studios in Burnaby, B.C.
Prism is the general contractor on the design build project and CTA Design Group: Architecture and Engineering is the architect. Weiler Smith Bowers is the consulting structural engineer.
The tilt up panels are being used to create a new soundstage, offices and workshops.
Two more phases of construction are planned for the studio over the next couple of years.
Recent Comments
comments for this post are closed