TORONTO — The Ontario Ministry of Transportation (MTO) has a announced detailed list of improvements to the Rutherford GO station north of Toronto.
A ministry statement released Nov. 21 explained the design-build-finance project includes a new multi-level parking structure with 1,200 new spaces; an integrated station building and pedestrian bridge to a new rail platform; re-design of the surface parking, kiss and ride, bus loop and pedestrian access; rail/road grade separation on Rutherford Road; new rail platforms; and a second heavy rail track and provision for a future third express centre track.
Infrastructure Ontario and Metrolinx has also issued a request for proposals to three shortlisted teams to design, build and finance the Rutherford project. The three teams are EllisDon Infrastructure Transit, Link Rutherford Station, and Steelhead.
Recent Comments
comments for this post are closed