The accompanying tables show the top 10 major upcoming Private and Government Office Building construction projects in Canada. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, government buildings, industrial projects, oil and gas projects, and electric power and telecommunications projects will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer |
Location | Current Stage |
Project Value canadian $ |
---|---|---|---|
EAST HARBOUR – FUTURE MIXED-USE DEVELOPMENT (MASTER PLAN) | |||
Cadillac Fairview Corporation Ltd – Toronto | Toronto ON | Schematic Design | $1,500,000,000 |
CLOVERDALE MALL REDEVELOPMENT, RESIDENTIAL RETAIL BUILDINGS | |||
QuadReal Property Group | Etobicoke ON | Schematic Design | $700,000,000 |
STONEGATE LANDING – STONEGATE CORPORATE CENTRE | |||
One Properties – Calgary | Calgary AB | Schematic Design | $550,000,000 |
COMMERCE COURT 3 | |||
QuadReal Property Group | Toronto ON | Construction Documents | $434,000,000 |
QUAYSIDE | |||
Waterfront Toronto | Toronto ON | Schematic Design | $400,000,000 |
UNION CENTRE | |||
Allied Properties REIT | Toronto ON | Schematic Design | $300,000,000 |
THE HUB OFFICE DEVELOPMENT | |||
Oxford Properties – Toronto | Toronto ON | Design Development | $300,000,000 |
RAKELY EGLINTON CORPORATE CENTRE | |||
Urban Strategies Ltd | Etobicoke ON | Schematic Design | $300,000,000 |
CIBC SQUARE OFFICE BUILDING – TOWER TWO | |||
Ivanhoe Cambridge Inc | Toronto ON | Construction Documents | $275,000,000 |
CENTRAL CITY OFFICE TOWER 2 MIXED-USE OFFICE BUILDING | |||
Urban Strategies Inc (Owner’s Rep) | Surrey BC | Design Development | $250,000,000 |
Project Title and Owner/Developer |
Location | Current Stage |
Project Value CANADIAN $ |
---|---|---|---|
PLACE DU PORTAGE PHASE III RENEWAL PDP 3 | |||
Public Service and Procurement Canada – Gatineau | Gatineau QC | Design Development | $500,000,000 |
DESIGN-BUILD – CITY OF BRAMPTON ELECTRIC BUS MAINTENANCE FACILITY – PHASE 1 & 2 | |||
City of Brampton | Brampton ON | Pre-Design | $280,000,000 |
CIVIC PRECINCT PROJECT/ PEOPLE PLACE RICHMOND HILL | |||
City of Richmond Hill | Richmond Hill ON | Pre-Design | $233,000,000 |
RFQ – 11 BAY STREET REDEVELOPMENT – DESIGN PARTNER SELECTION | |||
City of Toronto | Toronto ON | Pre-Design | $200,000,000 |
RFP DESIGN – LES TERRASSES DE LA CHAUDIÈRE COMPLEX (LTDLC) BUILDING ENVELOPE REPLACEMENT | |||
Public Service and Procurement Canada – Gatineau | Gatineau QC | Pre-Design | $190,000,000 |
AMBLESIDE INTEGRATED SITE – PARK OPERATIONS DISTRICT OFFICE AND FUEL STATION | |||
City of Edmonton | Edmonton AB | Design Development | $166,000,000 |
THORNHILL CIVIC CENTRE REDEVELOPMENT | |||
City of Calgary | Calgary AB | Pre-Design | $150,000,000 |
CITY OF TORONTO RECREATIONAL FACILITIES ACCESSIBILITY UPGRADES | |||
City of Toronto | Toronto ON | Schematic Design | $150,000,000 |
DESIGN BUILD OF 2 AIR EXPEDITIONARY WING AT CFB BAGOTVILLE | |||
Defence Construction Canada – Ottawa | La Baie QC | Pre-Design | $126,000,000 |
NEW FEDERAL BUILDING – SHAWINIGAN | |||
Public Service and Procurement Canada – Quebec City | Shawinigan QC | Schematic Design | $106,000,000 |
While every effort is made to ensure the correctness of ConstructConnect’s information, we have hundreds of thousands of projects in our database and some errors will occur. We greatly appreciate hearing from readers concerning updates and will make proper revisions promptly.
Recent Comments
comments for this post are closed