Skip to Content
View site list

Profile

Pre-Bid Projects

Pre-Bid Projects

Click here to see Canada’s most comprehensive listing of projects in conceptual and planning stages

Infrastructure

One day partial O-Train Line 1 closure to enable east connections

DCN-JOC News Services
One day partial O-Train Line 1 closure to enable east connections

OTTAWA — The City of Ottawa has announced that O-Train Line 1 service will be shut down for one day between St-Laurent and Blair stations while network control systems are integrated into the expanded east extension of the system.

The shutdown will take place Aug. 25. Full Line 1 service will resume on Aug. 26.

Line 1 service will continue to operate in both directions between St-Laurent and Tunney’s Pasture stations.

R1 replacement bus service will run between St-Laurent and Blair stations every 10 minutes on Aug. 25 and a shuttle will operate between St-Laurent and Cyrville stations every 15 minutes. Staff will also be at key stations to assist customers.

Recent Comments

Your comment will appear after review by the site.

You might also like