Skip to Content
View site list

Profile

Pre-Bid Projects

Pre-Bid Projects

Click here to see Canada's most comprehensive listing of projects in conceptual and planning stages

Infrastructure

IO, Osler issue RFP for Peel Memorial Hospital Phase 2 redevelopment

DCN-JOC News Services
IO, Osler issue RFP for Peel Memorial Hospital Phase 2 redevelopment
INFRASTRUCTURE ONTARIO — Infrastructure Ontario (IO) and William Osler Health System (Osler) recently issued a Request for Proposals (RFP) for the new Peel Memorial Hospital Phase 2 Redevelopment project. Shortlisted teams were invited to respond.

TORONTOA Request for Proposals (RFP) has been issued to shortlisted teams for the new Peel Memorial Hospital Phase 2 Redevelopment project.

The RFP was issued by Infrastructure Ontario (IO) and the William Osler Health System (Osler). The project will be delivered through IO’s progressive design-build (target price) contract model.

The new hospital will increase health care capacity in the community and address the need for more specialized care for patients requiring longer hospital stays, indicates a release. It will also include a purpose-built emergency department to ensure additional capacity.

Teams were shortlisted through a Request for Qualification process that began in May 2024 and are now invited to respond to the RFP. The teams and prime team members are:

  • Team Name: Progress Peel Health Solutions
    Applicant Leads: Amico Design Build Inc. and Sacyr Canada Inc. 
    Design Prime Team Members: Quadrangle Architects Limited, Kasian Architecture Ontario Inc. and WSP Canada Inc. 
    Construction Prime Team Members: Amico Design Build Inc. and Sacyr Canada Inc. 
  • Team Name: Pomerleau Healthcare Partners 
    Applicant Lead: Pomerleau Inc. 
    Design Prime Team Members: NEUF Architects Inc. and Cumulus Architects Inc. 
    Construction Prime Team Member: Pomerleau Inc. 
  • Team Name: EllisDon Corporation 
    Applicant Lead: EllisDon Corporation 
    Design Prime Team Members: Montgomery Sisam Architects Inc. and Kahler Slater Architects Inc. 
    Construction Prime Team Member: EllisDon Corporation 
  • Team Name: Bird Design-Build Construction Inc. 
    Applicant Lead: Bird Design-Build Construction Inc. 
    Design Prime Team Member: CannonDesign Ltd. 
    Construction Prime Team Member: Bird Design-Build Construction Inc.  

The teams will be preparing proposals that detail how they will deliver the project. The team selected will then work collaboratively with IO and Osler during a development phase, expected to begin in 2025. Once the development phase is completed, Osler may sign a construction contract with the successful team to deliver the project, states the release.

Recent Comments

Your comment will appear after review by the site.

You might also like