Form ID

Publication date

Location of premises

Certificate

Approximately 538 metres of ditch construction, remove existing culverts under White Street and Belisle Drive and construct 30m and 22m respectively of twin 1600mm diameter polymer coated CSP culverts including 10 sqm of additional riprap bank protection on filter underlay at each end of each culvert. Construct 10 sqm of other riprap on filter material (two locatons), construct two temporary rock sediment traps, remove existing farm laneway culvert and construct twin 14m lengths of 1400mm dia. polymer coated CSP culverts incuding 30m2 of riprap and raising of land

Date substantially performed:
Date certificate signed:

Participants

Office to which claim for lien must be given to preserve lien

The Clerk, The City of Greater Sudbury, P.O. Box 5000, Stn "A", Sudbury, ON P3A 5P3