Seventh Street between Yonge Street and Hugel Avenue
This is to certify that the contract for the following improvement:
The reconstruction of approximately 380 metres of road including the replacement of concrete curb and gutter, concrete sidewalk and full reinstatement of all areas disturbed during construction. Infrastructure works included the replacement of approximately 380 metres of watermain and sanitary sewer, including service replacement to property line and the installation of approximately 200 metres of storm sewer
To the above premises was substantially performed on: