The accompanying table records the 10 largest construction project starts in Canada in August 2019. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
REGION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s |
Dollars
000,000s |
Newfoundland and Labrador | Â | Â | Â | Â |
Corner Brook | Institutional | Design/Build – Corner Brook Acute Care Hospital Project | 600 | $750 |
 |  | (2 structures; 7 storeys; 164 units) Lewin Pkwy |  |  |
 |  | Department of Transportation and Works/Plenary Group |  |  |
 |  |  |  |  |
Quebec | Â | Â | Â | Â |
Mont-Royal | Commercial | Royalmount Mega-Mall | 4,000 | $1,700 |
 |  | (5 structures; 29 storeys) ave Royalmount |  |  |
 |  | Carbonleo |  |  |
 |  |  |  |  |
Montréal | Commercial | Centre de Transport Bellechasse | 648 | $254 |
 |  | (5 structures; 1 storey; 6 units) rue de Bellchasse |  |  |
 |  | Société de Transport de Montréal – STM |  |  |
 |  |  |  |  |
Mont-Royal | Industrial | Design-Build Montréal-Est Organic Material Processing Centre | 370 | $130 |
 |  | (3 structures; 4 storeys) autoroute 40 |  |  |
 |  | Ville de Montréal |  |  |
 |  |  |  |  |
Ontario | Â | Â | Â | Â |
Toronto | Engineering/Civil | Ashbridges Bay Treatment Plant Integrated Pumping Station – Construction Contract No 2 | * | $135 |
 |  | (2 structures) 9 Leslie St |  |  |
 |  | City of Toronto |  |  |
 |  |  |  |  |
Saskatchewan | Â | Â | Â | Â |
Carrot River | Engineering/Civil | EB Campbell Hydroelectric Station Alterations | * | $133 |
 |  | (1 structure) near Carrot River |  |  |
 |  | SaskPower |  |  |
 |  |  |  |  |
Alberta | Â | Â | Â | Â |
Edmonton | Residential | Ice District – Block B/G Mixed Use Development | 750 | $200 |
 |  | (4 structures; 43 storeys; 589 units) 102 St NW & 103 Ave NW |  |  |
 |  | ICE District Properties/ONE Properties/Katz Group |  |  |
 |  |  |  |  |
British Columbia | Â | Â | Â | Â |
Vancouver | Commercial | Centerm Expansion and South Shore Access Project | 43 | $454 |
 |  | (3 structures; 2 storeys) Heatley Ave |  |  |
 |  | DP World Americas/Vancouver Fraser Port Authority/Port Metro Vancouver |  |  |
 |  |  |  |  |
Burnaby | Residential | Concord Brentwood Phase 1B – Hillside East | 900 | $165 |
 |  | (2 structure; 55 storeys; 900 units) 4880 Lougheed Hwy |  |  |
 |  | Concord Pacific |  |  |
 |  |  |  |  |
Prince Rupert | Engineering/Civil | Fairview-Ridley Connector Road | * | $100 |
 |  | (2 structures) |  |  |
 |  | Prince Rupert Port Authority |  |  |
 |  |  |  |  |
TOTALS: | Â | Â | 7,311 | $4,021 |
Moving totals of the latest 12 months*
(ConstructConnect Insight Forecast Figures)
Recent Comments
comments for this post are closed