ST. JOHN’S — The Government of Newfoundland and Labrador has announced $59 million in contracts for roadwork throughout the province.
Fourteen contracts were recently awarded, including:
- A $6.9 million contract awarded to Farrell’s Excavating Ltd. for the rehabilitation of a section of the Burgeo Highway and the replacement of two structural plate pipe arches (Route 480);
- A $6.2 million contract awarded to J-1 Contracting Limited to rehabilitate various sections of Routes 335, 340 and 345;
- A $5.9 million contract awarded to Municipal Construction Ltd. for the paving of the Trans-Canada Highway from South Brook to West Bottom; rehabilitation of South Brook Bridge; rehabilitation of Grand Falls-Windsor Overpass eastbound and westbound; and the rehabilitation of Grand Falls-Windsor pedestrian overpass;
- A $5.7 million contract awarded to JCL Investments Inc. to pave sections of St. George’s Highway (Route 461); Codroy Road (Route 406); and Block Road (Route 407-13);
- A $5.4 million contract awarded to Marine Contractors Inc. for rehabilitation of a section of the Trans-Canada Highway from Doyles towards Tompkins;
- A $5 million contract to Nortech Construction Co. Ltd. to pave a section of Route 212 and replace a culvert on Route 210;
- A $4.2 million contract to Farrell’s Excavating Limited for the rehabilitation of the Whiteway South Highway (Route 420) and Country Road Hampden (Route 421-11);
- A $4 million contract awarded to Marine Contractors Inc. to pave a section of Cormack Road (Route 422) from Route 430 towards the Town of Cormack Municipal Building and a section of Howley Road (Route 401); and to patch sections of highway between Deer Lake Underpass (TCH-115) and Humber River Bridge;
- A $3.7 million contract awarded to Bay By Bay Ltd. for bridge rehabilitation on Route 360 and 361 – Southeast Brook Bridge, Bay D’Espoir Causeway Bridge, and Miguel’s Brook Bridge;
- A $3.5 million contract awarded to Concord Paving Limited to pave a section of Route 70 through Bay Roberts from Farm Road to north of the Water Street intersection; pave a section of Lead Cove (Route 80); and pave a section of Perry’s Cove (Route 70-37);
- A $2.9 million contract awarded to Nortech Construction Co. Ltd. to pave a section of Route 220;
- A $2.4 million contract awarded to Bay By Bay Ltd. for the rehabilitation of the Red Harbour East River Bridge and Red Harbour West River Bridge (Route 210); and rehabilitation of the Southeast Brook Bridge (Route 211-10) and Terrenceville Brook Bridge (Route 211);
- A $1.6 million contract awarded to Marine Contractors Inc. to pave main road through Trout River (Route 431-14) and culvert replacement on Riverside Drive (Route 431-14-2); and
- A $1.4 million contract awarded to C&T Enterprises Ltd. for the rehabilitation of Postville Airport, apron and access.
Recent Comments
comments for this post are closed