Your top DCN headlines this week feature news the construction costs in Toronto are remaining high, despite falling elsewhere; Dufferin has been awarded a contract to build part of a lane on Highway 400 that will connect to the future Bradford Bypass; ground has been broken at the future Pape station on the Ontario Line; and we take a look at the Don River flooding that occurred this week.
Dufferin awarded Highway 400 to Bradford Bypass connection contract
$1.25 billion Don River flood prevention ‘never designed’ to stop DVP deluge
Recent Comments
comments for this post are closed