Flood water levels on the Red River are receding at the construction site, east of Letellier, MB, where a new bridge connecting Provincial Road 201 with Highway 75 is being built in the shadow of the old span
CHRISTOPHER FRIESEN
Flood water levels on the Red River are receding at the construction site, east of Letellier, MB, where a new bridge connecting Provincial Road 201 with Highway 75 is being built in the shadow of the old span.
Bridge construction and associated roadwork are expected to be completed later this year. Ruskin Construction is the general contractor for this $35,000,000 project jointly funded by the Provincial and Federal Governments through the Infrastructure Stimulus Fund.
Recent Comments
comments for this post are closed