The accompanying tables show the top 10 major upcoming Water Treatment Plant and Manufacturing & Warehousing construction projects in the U.S. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, libraries and museums, sports and entertainment complexes, industrial projects and government buildings will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer | Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
CITY OF JACKSONVILLE SEPTIC TANK PHASEOUT – JACKSONVILLE ELECTRIC AUTHORITY | Â | Â | Â |
JEA (Jacksonville Electric Authority) – Procurement | Â Jacksonville FLÂ | Pre-Design | $2,000 |
HUNTINGTON BEACH WATER DESALINATION FACILITY | Â | Â | Â |
Poseidon Water – Carlsbad | Â Huntington Beach CAÂ | Pre-Design | $1,400 |
WATER POLLUTION CONTROL PLANTS – NEW YORK CITY MUNICIPAL WATER FINANCE AUTHORITY | Â | Â | Â |
City of New York Department of Environmental Protection/Water Supply (NYCDEP) | Â New York NY Â | Pre-Design | $650 |
STRAITS OF MACKINAC TUNNEL CONSTRUCTION – GREAT LAKES 5 PIPELINE REPLACEMENT | Â | Â | Â |
Enbridge Energy LP – Superior | Mackinaw City MI | Construction Documents | $500 |
MID-BRETON SEDIMENT DIVERSION – CITY OF PLAQUEMINE | Â | Â | Â |
Coastal Protection and Restoration Authority (CPRA) | Plaquemine LA | Pre-Design | $488 |
EAST WATER PURIFICATION PLANT – S-000056 – CITY OF HOUSTON | Â | Â | Â |
City of Houston | Houston TX Â | Pre-Design | $409 |
YAZOO PUMPS – US ARMY CORPS OF ENGINEERS | Â | Â | Â |
US Army Corps of Engineers – Vicksburg District | Yazoo City MS | Pre-Design | $400 |
RFP – SAN JUAN LATERAL WATER TREATMENT PLANT (SJLWTP) | Â | Â | Â |
US Bureau of Reclamation – Upper Colorado Regional Office | Waterflow NM Â | Pre-Design | $350 |
SOUTHERLY TUNNEL AND CONSOLIDATION – NORTHEAST OHIO REGIONAL SEWER DISTRICT (NEORSD) | Â | Â | Â |
Northeast Ohio Regional Sewer District (NEORSD) | Cleveland OH | Pre-Design | $326 |
RFQ D/B – DAVID L. TIPPIN WATER TREATMENT FACILITY (DLTWTF) MASTER PLAN IMPROVEMENTS DESIGN-BUILD | Â | Â | Â |
City of Tampa – Public Works Department | Tampa FL | Design Development | $300 |
Project Title and Owner/Developer | Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
SAMSUNG AUSTIN SEMICONDUCTOR WAFER FABRICATION PLANT FAB NO. 2 – 10 | Â | Â | Â |
Samsung Electronics America, Inc. | Taylor TX | Pre-Design | $167,600 |
MICRON TECHNOLOGY INC NEW MANUFACTURING FACILITY | Â | Â | Â |
Micron Technology Inc / Manassas | Manassas VA | Pre-Design | $40,000 |
SAMSUNG AUSTIN SEMICONDUCTOR WAFER FABRICATION PLANT FAB NO. 3 & 4 | Â | Â | Â |
Samsung Electronics America, Inc. | Manor TX | Pre-Design | $24,500 |
INTEL SILICONE HEARTLAND CHIP FACTORY DEVELOPMENT | Â | Â | Â |
Intel Corporation | Columbus OH | Pre-Design | $20,000 |
MICRON TECHNOLOGY | Â | Â | Â |
Micron Technology Inc | Syracuse NY | Pre-Design | $20,000 |
NEW FABRICATION PLANT – MICRON TECHNOLOGY INC | Â | Â | Â |
Micron Technology Inc | Boise ID | Pre-Design | $15,000 |
GENARD EXPANSION | Â | Â | Â |
PDG Architects (Owner’s Rep) | Houston TX | Design Development | $15,000 |
FORMOSA PLASTICS SUNSHINE PROJECT | Â | Â | Â |
Formosa Plastics LA | Saint James LA | Construction Documents | $12,000 |
GRON FUELS RENEWABLE DIESEL PLANT | Â | Â | Â |
Fidelis Infrastructure | Baton Rouge LA | Pre-Design | $9,200 |
SEMPRA ENERGY – LIQUEFIED NATURAL GAS EXPORT TERMINAL – PHASE 1 TRAINS 1 & 2 / PORT ARTHUR | Â | Â | Â |
Sempra Energy | Port Arthur TX | Construction Documents | $9,000 |
While every effort is made to ensure the correctness of ConstructConnect’s information, we have hundreds of thousands of projects in our database and some errors will occur. We greatly appreciate hearing from readers concerning updates and will make proper revisions promptly.
Recent Comments
comments for this post are closed