KAMLOOPS, B.C. — Kelson Group’s City Gardens development in Kamloops reached several milestones recently with the start of construction on tower two to interior finishes well underway on its Trillium tower.
The 24-storey project is on track for completion later this year, while the second tower, Alyssium, begins its ascent, and the first of the six-storey condos, Orchid, takes shape, states the developer.
Alyssium will be a 20-storey residential tower with a total of 136 suites. Level three for this building was poured last week and it is scheduled for completion in 2027.
At the same time, Orchid, a six-storey wood-frame building with eight townhouses and 26 apartment suites, will start construction with a projected completion date in early 2027.
The start of construction of Birch and Aspen, both rental apartment buildings, and Lotus, a collection of townhomes and apartments, will be announced at a later date.
Recent Comments