The accompanying tables show the top 10 major upcoming Private and Government Office Building construction projects in the U.S. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, libraries and museums, sports and entertainment complexes, industrial projects and government buildings will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer |
Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
GOLDEN PLAINS TECHNOLOGY PARK / KANSAS CITY | |||
DL3 Realty | Kansas City MO | Schematic Design | $6,000 |
LINCOLN YARDS | |||
Lincoln Harris – Charlotte | Chicago IL | Design Development | $5,965 |
EMPIRE STATION COMPLEX | |||
Coventry Development Corporation | New York NY | Pre-Design | $5,000 |
LONE TREE CITY CENTER AT RIDGEGATE | |||
Konterra Realty LLC | Lone Tree CO | Pre-Design | $2,800 |
KONTERRA TOWN CENTER EAST | |||
Kirtland AFB Albuquerque Field Operation | Laurel MD | Design Development | $2,500 |
PLACER RANCH – PLACER COUNTY | |||
JBG Smith | Roseville CA | Pre-Design | $2,000 |
SOUTHEASTERN DATA CENTER CAMPUS | |||
FX Collaborative – New York Office (Owner’s Rep) | Fayetteville GA | Pre-Design | $2,000 |
PRINCE WILLIAM COUNTY DATA CENTER DEVELOPMENT | |||
North Colorado Medical Center | Manassas VA | Construction Documents | $1,700 |
THE HUB | |||
Redbrick LMD LLC | Dulles VA | Schematic Design | $1,600 |
SAN FRANCISCO FLOWER MART REDEVELOPMENT | |||
Hoffman-Madison Waterfront | San Francisco CA | Design Development | $1,500 |
Project Title and Owner/Developer |
Location | Current Stage |
Project Value U.S. $ millions |
---|---|---|---|
DESTINATION MEDICAL CENTER – ALL OTHER PHASES | |||
DMC EDA | Rochester MNÂ | Pre-Design | $6,000 |
FBI HEADQUARTERS REBUILD | |||
US General Services Administration – Public Buildings Service | Washington DCÂ | Pre-Design | $4,000 |
REPLACEMENT OF THE EXISTING CALIFORNIA STATE CAPITOL ANNEX | |||
CA Department of General Services – Contracts Management and Procurement Services | Sacramento CAÂ | Schematic Design | $1,200 |
SMITHSONIAN SUITLAND COLLECTIONS CENTER | |||
Smithsonian Institution – Office of Planning, Design & Construction | Camp Springs MDÂ | Schematic Design | $900 |
LATIN AMERICAN MUSEUM | |||
Nader + Museu | Miami FLÂ | Schematic Design | $673 |
LA BREA TAR PITS & GEORGE C. PAGE MUSEUM MASTER RENOVATION PLAN | |||
Natural History Museums of Los Angeles County | Los Angeles CAÂ | Schematic Design | $650 |
THE METROPOLITAN MUSEUM OF ART SOUTHWEST WING | |||
The Metropolitan Museum of Art | New York NYÂ | Schematic Design | $600 |
RFQ CONTRACTOR – RENOVATION OF WRIGHT-PATTERSON AIR FORCE BASE (WPAFB) AIR FORCE MATERIEL COMMAND HEADQUARTERS | |||
U.S. Army Corps of Engineers / Louisville District | Wright Patterson AFB OHÂ | Pre-Design | $500 |
OBAMA PRESIDENTIAL CENTER LIBRARY | |||
The Barack Obama Foundation | Chicago ILÂ | Design Development | $500 |
TEST, ADJUST, AND BALANCE CAPITOL COMPLEX PROJECTS – PHASE1 | |||
Texas Facilities Commission (TFC) | Austin TXÂ | Schematic Design | $477 |
While every effort is made to ensure the correctness of ConstructConnect’s information, we have hundreds of thousands of projects in our database and some errors will occur. We greatly appreciate hearing from readers concerning updates and will make proper revisions promptly.