Construction manager Aecon Buildings and MHPM Project Managers Inc. began the five-storey Bell Creekbank office building in spring 2007. Completion is scheduled for late fall 2008.
Construction manager Aecon Buildings and MHPM Project Managers Inc. began the five-storey Bell Creekbank office building in spring 2007. Completion is scheduled for late fall 2008.
Bregman + Hamann Architects designed the building for owner/developer Bell Canada/H + R REIT.
The following consultants are working on the Bell Creekbank Phase III project:
• AM Candaras Associates Inc. (civil);
• Carruthers and Wallace Ltd. (structural);
• Hidi & Associates Inc. (mechanical);
• Lapas Consulting Engineers Ltd. (electrical);
• HH Angus (elevator); and
• Quinn Design Associates Inc. (landscape).
Subtrades on the project include the following:
• Ragno Excavating Ltd.;
• Strong Foundations (rock anchors);
• Harris Rebar;
• Alliance Forming Ltd. (formwork);
• Innocon Inc. (concrete supply);
• Geo. A. Kelson Co. Ltd. (mechanical);
• Interborough Electric (underground electrical);
• Ampere Ltd. (electrical);
• Paul and Douglas (sprinkler/fire protection);
• Ferguson Neudorf Glass Inc. (curtain wall);
• Bothwell-Accurate Co. Ltd. (waterproofing);
• Otis Canada Inc. (elevators);
• Dean Chandler (roofing);
• Mometal Structures (structural steel and misc. metals);
• ACML (asphalt/underground mechanical);
• Limen Masonry;
• Ankor Engineering Inc. (roof anchors);
• Vixman (siding);
• Select Drywall and Acoustics (drywall);
• Air Quality Solutions (greenwall);
• Upper Canada (hardware/doors/frames);
• JWS (millwork);
• Castlewall (tile work);
• C. J. Duguid (resilient flooring);
• Alliance Waterproofing (surface demolition);
• Odyssey Fireplace (fireplace supply);
• Aldershot Landscaper Contractors Ltd. (landscaping);
• F&M Caulking (caulking);
• Decoral (painting);
• Inter Coordinators (washroom accessories); and
• Solar Effective (window blinds).
Recent Comments
comments for this post are closed