The accompanying table records the 10 largest construction project starts in Canada in July 2020. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
REGION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s |
Dollars
000,000s |
Quebec | Â | Â | ||
Montreal | Residential | 1 Square Phillips – Phase 1 (Mixed-Use Condominium) | 1,313 | $400 |
 |  | (3 structures; 61 storeys; 800 units) 1201, pl Phillips |  |  |
 |  | Groupe Brivia |  |  |
 |  |  |  |  |
Saint-Laurent | Engineering/Civil | Design/Build Pont Champlain Bridge Deconstruction | * | $226 |
 |  | (2 structures) av Atwater |  |  |
 |  | Jacques Cartier and Champlain Bridges Incorporated |  |  |
 |  |  |  |  |
Quebec | Engineering/Civil | Promenade Samuel-de-Champlain – Phase III | * | $160 |
 |  | (2 structures) boul Champlain |  |  |
 |  | Société québécoise des infrastructures SQI |  |  |
 |  |  |  |  |
Ontario | Â | Â | Â | Â |
Nepean | Industrial | Second Amazon Distribution Centre / Ottawa (Project Python) | 2,720 | $320 |
 |  | (2 structures; 5 storeys) 222 Citigate Dr |  |  |
 |  | Broccolini Construction (Owner’s Rep) |  |  |
 |  |  |  |  |
Markham | Institutional | York University Markham Centre Campus Phase 1 | 400 | $276 |
 |  | (2 structures; 10 storeys; 4200 units) Rivis Rd & Enterprise Blvd |  |  |
 |  | York University |  |  |
 |  |  |  |  |
Mississauga | Residential | EX1 – Exchange District Condos – Phase One | 1,000 | $185 |
 |  | (1 structure; 60 storeys; 1000 units) 151 City Centre Dr |  |  |
 |  | Camrost-Felcorp |  |  |
 |  |  |  |  |
Oshawa | Residential | UC Tower / Oshawa | 700 | $128 |
 |  | (1 structure; 25 storeys; 503 units) 2535 Thoroughbred St |  |  |
 |  | Tribute Communities |  |  |
 |  |  |  |  |
Toronto | Residential | King Toronto – Condos | 500 | $92 |
 |  | (3 structures; 17 storeys; 514 units) 489 King St W |  |  |
 |  | Allied Properties REIT |  |  |
 |  |  |  |  |
London | Residential | Fullarton Street Tower – Phase One | 435 | $80 |
 |  | (4 structures; 41 storeys; 420 units) 100 Fullarton St |  |  |
 |  | Old Oak Properties |  |  |
 |  |  |  |  |
British Columbia | Â | Â | Â | Â |
Victoria | Institutional | University of Victoria Student Housing & Dining Hall | 345 | $200 |
 |  | (1 structure; 11 storeys; 783 units) 3800 Finnerty Rd |  |  |
 |  | University of Victoria |  |  |
 |  |  |  |  |
TOTALS: | Â | Â | 7,413 | $2,067 |
Moving totals of the latest 12 months*
(ConstructConnect Insight Forecast Figures)
Interactive Visual
View this video to see how to use the filters in the Interactive Visual.
Recent Comments
comments for this post are closed