Skip to Content
View site list

Profile

Pre-Bid Projects

Pre-Bid Projects

Click here to see Canada’s most comprehensive listing of projects in conceptual and planning stages

Infrastructure, Others, Projects

First Notice: Buildings Week launches; Mississauga labs open; Copper mine expansion plans

DCN-JOC News Services
First Notice: Buildings Week launches; Mississauga labs open; Copper mine expansion plans

 

Buildings Week opens today

Today is day one of Buildings Week, being held virtually for the first time. The Buildings Show and BUILDEX Alberta event is expected to connect more than 70,000 design, construction and real estate professionals across Canada all week, Nov. 30 to Dec. 4. Watch for Daily Commercial News coverage.  

 

NRC energy research lab opens in Mississauga

Diamond Schmitt last week announced completion of the National Research Council’s new advanced materials research facility in Mississauga, Ont. Designed by Diamond Schmitt, the facility will serve as a national clean energy hub, supporting research of new materials for clean energy and other applications. The two-storey, 21,500-square-foot facility is designed with flexible laboratory and office spaces that are divisible by removable partition systems, with multiple layers of secure access.  

 

EllisDon Forming lands London contract

EllisDon announced Nov. 26 its division EllisDon Forming Ltd. has been awarded the concrete and formwork work for two new towers located on the Old Victoria Hospital lands in London, Ont. The 620-unit development has a 60,000-square-floor plate in its five-level podium with 19- and 24-storey towers on top. 

 

Copper Mountain proposes mine expansion

Copper Mountain Mining Corporation today announced a new life-of-mine plan for its Copper Mountain Mine, located in southern British Columbia, that includes expansion of the millThe initial capital cost required to increase throughput to 65,000 tonnes per day is estimated to be $123 million, plus a $25million contingency, for a total of $148 million. The plan includes the installation of the HPGR circuit, fourth ball mill, regrind circuit, verti-mill, additional rougher and cleaner flotation circuits and electrical system upgrades.  

Recent Comments

comments for this post are closed

You might also like