Skip to Content
View site list

Profile

Pre-Bid Projects

Pre-Bid Projects

Click here to see Canada’s most comprehensive listing of projects in conceptual and planning stages

Projects

PHOTO/VIDEO: Galleria, Galleria

PHOTO/VIDEO: Galleria, Galleria

A drone view shows below-grade work progressing for Galleria 01 and Galleria 02, the first two towers of the Galleria on the Park mixed-use development at Dufferin and Dupont streets in Toronto.

The work includes one 29-storey, 267-suite tower and one 24-storey tower with 217 suites. Both will be built above a podium with retail on the ground and first floors and five levels of underground parking. The amenities will include a rebuilt Wallace Emerson Community Centre and park, a fitness zone, a kids’ playroom, a social lounge/co-working space, a games room, an outdoor terrace and a swimming pool.

 

Developer — ELAD Canada

Architects — Core Architects (Galleria 01), Perkins and Will (community centre)

Master plan designers — Hariri Pontarini Architects and Urban Strategies

Consultants are — Counterpoint Engineering (civil), U31 (interior design Galleria 01) and NAK Design Strategies (landscape)

Subtrades include — GFL, Michael Bros. Excavating, Anchor Shoring and Caissons and CBM (concrete)

 

IAN CONWAY/PROGRESS PHOTOGRAPHY

 

Previous Galleria on the Park Progress Updates

JANUARY 19, 2021 — IAN CONWAY/PROGRESS PHOTOGRAPHY

Recent Comments

comments for this post are closed

You might also like