A new four-bay View Royal Fire Hall, near Victoria, B.C. is taking shape.
Construction started on the 2.4-acre site in September 2013 and work on the $7.49 million project should be complete by October. Ledcor is the general contractor. Hughes Condon Marler Architects did the design. Structural engineering is provided by Read Jones Christoffersen, The AME Group served as mechanical engineers and the Advicas Group is the cost consultant.
![002_RBI-image-1001008](https://cc-production-uploads-bucket.s3.amazonaws.com/uploads/2017/10/002_RBI-image-1001008.jpeg)
Recent Comments
comments for this post are closed