Skip to Content
View site list

Profile

Pre-Bid Projects

Pre-Bid Projects

Click here to see Canada's most comprehensive listing of projects in conceptual and planning stages

Others

McKay-Cocker Construction plays hard at the Columbia Sportswear Distribution Centre project

Daily Commercial News
McKay-Cocker Construction plays hard at the Columbia Sportswear Distribution Centre project
Site work is underway for the Columbia Sportswear Distribution Centre in Strathroy, Ont. McKay-Cocker Construction Ltd. began the two-storey, design-build centre in September and completion is scheduled for March. The project was designed by Paul Kershaw Architects. Consultants are: Mardon Engineering Ltd. (structural); Barrett Mechanical (d-b mechanical); Technicair Ltd. (mechanical); and Johnson Electric Inc. (d-b electrical). Subtrades include: J-AAR Excavating Ltd. McKay-Cocker Construction Ltd. (formwork); Dietrich Steel Ltd. (rebar supply); Spencer Steel Ltd. (structural steel); Lafarge Construction Materials (concrete supply); Bravo Cement Contracting (concrete finishing); Vipond Fire Protection; Stewart Overhead Door; and Thames Glass Ltd. (windows).

Work is underway on the Columbia Sportswear Distribution Centre in Strathroy, Ontario. McKay-Cocker Construction Ltd. began the two-storey, design-build centre in September and completion is scheduled for March.

Recent Comments

comments for this post are closed

You might also like